What is the typical sequence of events for a Smart Studio build?
The process begins with an initial budgetary proposal, followed by site inspection and a firm proposal with detailed drawings and costings. After manufacturing off-site, the components are shipped and installed on a just-in-time basis. Acoustic testing and equipment commissioning follow installation